HEMAMCO

Hyperlulu Mall - Taif

Hyperlulu Mall - Taif

Hyper Lulu Mall project is a unique commercial project in Al Jal neighborhood in Taif on an area of 33,000 m² using the post-tensioned concrete system.

Hyperlulu - Taif - A sophisticated commercial project

Hyperlulu - Taif - A unique commercial project on an area of 33,000 m²

Project Overview

Hyper Lulu is one of the unique projects in Taif, located in Al Jal neighborhood and has a building area of 33,000 square meters. After studying the safe and cost-effective structural system, post-tensioned concrete was chosen as the optimal structural solution.

🏪

A unique business venture

The most prominent modern commercial projects in Taif

📏

Large area

33,000 flat meters of state-of-the-art construction space

Advanced construction system

Post-tensioned concrete system as an optimal structural solution

Detailed Project Specifications

ItemsSpecificationsTechnical Details
Project NameHyperluluUnique commercial project in Taif
LocationAl-Jal Neighborhood - TaifLocated in one of the most prominent neighborhoods in Taif city
Total Built-Up Area (BUA)33,000 m²Building spaces including facilities and equipment
Creation systemPost-tensioned concreteThe safest and most cost-effective construction system
Project typeCommercialFull-service hypermarket

Post-tensioned concrete system

The post-stressed slab is one of the important slabs based on a ballless slab system, it reduces the iron content and has the ability to withstand large seas from 9 to 16 meters.

📉 Reducing slab thickness and increasing beads

Possibility of implementing large ponds while minimizing slab thickness

🔩 Iron savings

Significantly reduced iron usage compared to conventional systems

⚡ High speed of execution

Shorter implementation time compared to traditional methods

🏗️ High loads

Bearing capacity up to 1.2 tons per flat meter

👥 Shortage of labor

Saving on labor required for implementation

Technical features of the system

🎯 High structural efficiency

Ability to withstand heavy loads while minimizing the materials used

💰 Economic savings

Reduce material and labor costs while maintaining quality

⏱️ Speed of execution

Shorter implementation times compared to traditional systems

🏢 Design flexibility

Possibility to implement large open spaces without obstacles

Features of Hyperlulu Mall Project

Strategic location

Located in Al-Jal, one of the most prominent neighborhoods in Taif

🛒 vast commercial space

33,000 m² of high-end commercial space

🔧 Advanced Structural Solutions

Utilizing the latest technologies in construction

🎪 Community Service

Providing an integrated commercial center to serve Taif residents

Project Highlights & Outcomes

Hyperlulu in Taif represents a paradigm shift in commercial projects in the region, combining a strategic location with a state-of-the-art structural design. The post-tensioned concrete system was chosen as the optimal structural solution due to its significant technical and economic advantages, making the project a model of structural efficiency and economic feasibility.

Project highlights:

🏗️ Implementation of a commercial project on an area of 33,000 m² in a strategic location
⚡ Using post-tensioned concrete as an advanced structural solution
💰 Significant savings in iron and construction materials
📏 Enabling the implementation of large seas up to 16 meters without cameras
⏱️ Achieve faster implementation and reduce overall costs
🏢 Providing an integrated commercial center that serves Taif residents
Top