{"id":2079,"date":"2025-03-25T21:41:47","date_gmt":"2025-03-25T18:41:47","guid":{"rendered":"https:\/\/hemamco.sa\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/"},"modified":"2026-03-19T01:56:11","modified_gmt":"2026-03-18T22:56:11","slug":"%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa","status":"publish","type":"post","link":"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/","title":{"rendered":"Post Tension Slab | Complete solutions for your construction needs"},"content":{"rendered":"<p style=\"direction: rtl; text-align: right;\">Wondering how to enhance the durability of buildings and improve their structural performance? Here at <a href=\"https:\/\/hemamco.sa\/en\" target=\"_blank\" rel=\"noopener\">Hemam Al-Orouba<\/a> We seek to provide solutions <strong>Technique<\/strong> advanced by utilizing <em>Post-tensioning<\/em> In projects <strong>Construction<\/strong> Different.<\/p>\n<p style=\"direction: rtl; text-align: right;\">We provide complete solutions for your construction needs using <strong>Screwing<\/strong> Subsequently, contributing to the strength of the <strong>Buildings<\/strong> and durability. Thanks to our team of experienced engineers and technicians, we ensure the implementation of<strong>\u00a0Tension Slab<\/strong> according to the highest quality standards.<\/p>\n<p style=\"direction: rtl; text-align: right;\">As <strong>Contractor<\/strong> We specialize in developing innovative solutions to construction challenges in various <strong>Projects<\/strong>. We are committed to providing quality services that meet the needs of our customers.<\/p>\n<p style=\"direction: rtl;\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-2100\" src=\"https:\/\/hemamco.sa\/wp-content\/uploads\/2025\/03\/\u064a\u0648\u0633\u062a-\u062a\u0646\u0634\u0646-.webp\" alt=\"PostTension System\" width=\"1280\" height=\"705\" title=\"\" srcset=\"https:\/\/hemamco.sa\/wp-content\/uploads\/2025\/03\/\u064a\u0648\u0633\u062a-\u062a\u0646\u0634\u0646-.webp 1280w, https:\/\/hemamco.sa\/wp-content\/uploads\/2025\/03\/\u064a\u0648\u0633\u062a-\u062a\u0646\u0634\u0646--300x165.webp 300w, https:\/\/hemamco.sa\/wp-content\/uploads\/2025\/03\/\u064a\u0648\u0633\u062a-\u062a\u0646\u0634\u0646--1024x564.webp 1024w, https:\/\/hemamco.sa\/wp-content\/uploads\/2025\/03\/\u064a\u0648\u0633\u062a-\u062a\u0646\u0634\u0646--768x423.webp 768w, https:\/\/hemamco.sa\/wp-content\/uploads\/2025\/03\/\u064a\u0648\u0633\u062a-\u062a\u0646\u0634\u0646--1170x644.webp 1170w\" sizes=\"(max-width: 1280px) 100vw, 1280px\" \/><\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_75 ez-toc-wrap-right counter-hierarchy ez-toc-counter-rtl ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Headlines<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-toggle-hide-by-default' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D9%86%D8%B8%D8%A7%D9%85_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8_%D8%AA%D9%82%D9%86%D9%8A%D8%A9_%D9%85%D8%AA%D8%B7%D9%88%D8%B1%D8%A9_%D9%81%D9%8A_%D8%B9%D8%A7%D9%84%D9%85_%D8%A7%D9%84%D8%A8%D9%86%D8%A7%D8%A1\" >Post Tension Slab: A cutting-edge technology in the world of construction<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D9%85%D8%A7_%D9%87%D9%88_%D9%86%D8%B8%D8%A7%D9%85_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8%D8%9F\" >What is the Post Tension Slab system?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D8%A3%D9%87%D9%85%D9%8A%D8%A9_%D8%A7%D8%B3%D8%AA%D8%AE%D8%AF%D8%A7%D9%85_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D9%81%D9%8A_%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9_%D8%A7%D9%84%D8%A5%D9%86%D8%B4%D8%A7%D8%A6%D9%8A%D8%A9\" >The importance of using PostTension in construction projects<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D9%85%D9%83%D9%88%D9%86%D8%A7%D8%AA_%D9%86%D8%B8%D8%A7%D9%85_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8\" >Post Tension Slab Components<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D8%A7%D9%84%D9%83%D8%A7%D8%A8%D9%84%D8%A7%D8%AA_%D9%88%D8%A7%D9%84%D8%A3%D8%B3%D9%84%D8%A7%D9%83_%D8%A7%D9%84%D9%85%D8%B3%D8%AA%D8%AE%D8%AF%D9%85%D8%A9_Strands\" >Used cables and wires (Strands)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D9%86%D9%87%D8%A7%D9%8A%D8%A7%D8%AA_%D8%A7%D9%84%D9%83%D8%A7%D8%A8%D9%84%D8%A7%D8%AA_Dead_end_Live_end\" >Dead end &amp; Live end<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D8%A7%D9%84%D8%A3%D9%86%D8%A7%D8%A8%D9%8A%D8%A8_%D8%A7%D9%84%D9%88%D8%A7%D9%82%D9%8A%D8%A9_Ducts\" >Ducts<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D8%A7%D9%84%D9%83%D8%B1%D8%A7%D8%B3%D9%8A_%D9%88%D8%A7%D9%84%D8%AF%D8%B9%D8%A7%D9%85%D8%A7%D8%AA\" >Chairs and supports<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D9%85%D9%83%D9%88%D9%86%D8%A7%D8%AA_%D8%A5%D8%B6%D8%A7%D9%81%D9%8A%D8%A9_%D8%B6%D8%B1%D9%88%D8%B1%D9%8A%D8%A9_%D9%84%D9%84%D8%AA%D9%86%D9%81%D9%8A%D8%B0\" >Additional components necessary for implementation<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D9%85%D8%B2%D8%A7%D9%8A%D8%A7_%D8%A7%D8%B3%D8%AA%D8%AE%D8%AF%D8%A7%D9%85_%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8_%D9%81%D9%8A_%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9%D9%83\" >Advantages of using Post Tension Slab in your projects<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D8%AA%D9%82%D9%84%D9%8A%D9%84_%D8%B3%D9%85%D8%A7%D9%83%D8%A9_%D8%A7%D9%84%D8%A8%D9%84%D8%A7%D8%B7%D8%A7%D8%AA_%D9%88%D9%83%D9%85%D9%8A%D8%A9_%D8%A7%D9%84%D8%AE%D8%B1%D8%B3%D8%A7%D9%86%D8%A9\" >Minimize slab thickness and amount of concrete<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D8%B2%D9%8A%D8%A7%D8%AF%D8%A9_%D8%A7%D9%84%D9%85%D8%B3%D8%A7%D8%AD%D8%A7%D8%AA_%D9%88%D8%AA%D9%82%D9%84%D9%8A%D9%84_%D8%B9%D8%AF%D8%AF_%D8%A7%D9%84%D8%A3%D8%B9%D9%85%D8%AF%D8%A9\" >Maximize space and minimize the number of columns<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D8%AA%D8%AD%D8%B3%D9%8A%D9%86_%D9%85%D9%82%D8%A7%D9%88%D9%85%D8%A9_%D8%A7%D9%84%D9%85%D9%86%D8%B4%D8%A2%D8%AA_%D9%84%D9%84%D8%B2%D9%84%D8%A7%D8%B2%D9%84_%D9%88%D8%A7%D9%84%D8%A7%D9%87%D8%AA%D8%B2%D8%A7%D8%B2%D8%A7%D8%AA\" >Improving the resistance of structures to earthquakes and vibrations<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D8%AA%D9%88%D9%81%D9%8A%D8%B1_%D8%A7%D9%84%D9%88%D9%82%D8%AA_%D9%88%D8%A7%D9%84%D8%AA%D9%83%D9%84%D9%81%D8%A9_%D9%81%D9%8A_%D8%A7%D9%84%D8%AA%D9%86%D9%81%D9%8A%D8%B0\" >Save time and cost in implementation<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D9%85%D8%B1%D8%A7%D8%AD%D9%84_%D8%AA%D9%86%D9%81%D9%8A%D8%B0_%D8%A3%D8%B9%D9%85%D8%A7%D9%84_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8\" >Post Tension Slab Implementation Stages<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D9%85%D8%B1%D8%AD%D9%84%D8%A9_%D8%A7%D9%84%D8%AA%D8%B5%D9%85%D9%8A%D9%85_%D9%88%D8%A7%D8%B9%D8%AA%D9%85%D8%A7%D8%AF_%D8%A7%D9%84%D9%85%D9%88%D8%A7%D8%AF\" >Design and Material Approval Phase<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D9%85%D8%B1%D8%AD%D9%84%D8%A9_%D8%A7%D9%84%D8%AA%D9%86%D9%81%D9%8A%D8%B0_%D9%88%D8%AA%D8%B1%D9%83%D9%8A%D8%A8_%D8%A7%D9%84%D9%83%D8%A7%D8%A8%D9%84%D8%A7%D8%AA\" >Implementation and cable installation phase<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D9%85%D8%B1%D8%AD%D9%84%D8%A9_%D8%A7%D9%84%D8%B4%D8%AF_%D8%A8%D8%B9%D8%AF_%D8%B5%D8%A8_%D8%A7%D9%84%D8%AE%D8%B1%D8%B3%D8%A7%D9%86%D8%A9\" >Tensioning stage after pouring concrete<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D9%85%D8%B1%D8%AD%D9%84%D8%A9_%D8%A7%D8%B9%D8%AA%D9%85%D8%A7%D8%AF_%D8%A7%D9%84%D9%86%D8%AA%D8%A7%D8%A6%D8%AC_%D9%88%D8%A7%D9%84%D8%AD%D9%82%D9%86\" >Authorization and Injection Phase<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D8%AA%D8%B7%D8%A8%D9%8A%D9%82%D8%A7%D8%AA_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8_%D9%81%D9%8A_%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9_%D8%A7%D9%84%D9%85%D8%AE%D8%AA%D9%84%D9%81%D8%A9\" >Post Tension Slab applications in different projects<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D8%A7%D9%84%D9%85%D8%A8%D8%A7%D9%86%D9%8A_%D8%A7%D9%84%D8%B3%D9%83%D9%86%D9%8A%D8%A9_%D9%88%D8%A7%D9%84%D8%AA%D8%AC%D8%A7%D8%B1%D9%8A%D8%A9\" >Residential and commercial buildings<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D8%A7%D9%84%D9%85%D9%86%D8%B4%D8%A2%D8%AA_%D8%B0%D8%A7%D8%AA_%D8%A7%D9%84%D8%A8%D8%AD%D9%88%D8%B1_%D8%A7%D9%84%D9%88%D8%A7%D8%B3%D8%B9%D8%A9\" >Facilities with large seas<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9_%D8%A7%D9%84%D8%A8%D9%86%D9%8A%D8%A9_%D8%A7%D9%84%D8%AA%D8%AD%D8%AA%D9%8A%D8%A9\" >Infrastructure Projects<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D8%A7%D9%84%D8%AE%D9%84%D8%A7%D8%B5%D8%A9_%D9%84%D9%85%D8%A7%D8%B0%D8%A7_%D8%AA%D8%AE%D8%AA%D8%A7%D8%B1_%D8%AE%D8%AF%D9%85%D8%A7%D8%AA%D9%86%D8%A7_%D9%81%D9%8A_%D8%AA%D9%86%D9%81%D9%8A%D8%B0_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8\" >Conclusion: Why Choose Our Post Implementation Services<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D8%A7%D9%84%D8%A3%D8%B3%D8%A6%D9%84%D8%A9_%D8%A7%D9%84%D8%B4%D8%A7%D8%A6%D8%B9%D8%A9_%D8%AD%D9%88%D9%84_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8\" >Post Tension Slab FAQ<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-26\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D9%85%D8%A7_%D9%87%D9%8A_%D8%AA%D9%82%D9%86%D9%8A%D8%A9_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8%D8%9F\" >What is Post Tension Slab technology?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-27\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D9%85%D8%A7_%D9%87%D9%8A_%D9%85%D8%B2%D8%A7%D9%8A%D8%A7_%D8%A7%D8%B3%D8%AA%D8%AE%D8%AF%D8%A7%D9%85_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8_%D9%81%D9%8A_%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9_%D8%A7%D9%84%D8%A8%D9%86%D8%A7%D8%A1%D8%9F\" >What are the advantages of using Post Tension Slab in construction projects?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-28\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D9%83%D9%8A%D9%81_%D9%8A%D8%AA%D9%85_%D8%AA%D9%86%D9%81%D9%8A%D8%B0_%D8%A3%D8%B9%D9%85%D8%A7%D9%84_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8%D8%9F\" >How does the Post Tension Slab work?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-29\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D9%85%D8%A7_%D9%87%D9%8A_%D8%AA%D8%B7%D8%A8%D9%8A%D9%82%D8%A7%D8%AA_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8_%D9%81%D9%8A_%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9_%D8%A7%D9%84%D9%85%D8%AE%D8%AA%D9%84%D9%81%D8%A9%D8%9F\" >What are the applications of PostTension Slab in different projects?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-30\" href=\"https:\/\/hemamco.sa\/en\/%d8%a8%d9%88%d8%b3%d8%aa-%d8%aa%d9%86%d8%b4%d9%86-%d8%b3%d9%84%d8%a7%d8%a8-%d8%ad%d9%84%d9%88%d9%84-%d9%85%d8%aa%d9%83%d8%a7%d9%85%d9%84%d8%a9-%d9%84%d8%a7%d8%ad%d8%aa%d9%8a%d8%a7%d8%ac%d8%a7%d8%aa\/#%D9%84%D9%85%D8%A7%D8%B0%D8%A7_%D8%AA%D8%AE%D8%AA%D8%A7%D8%B1_%D8%AE%D8%AF%D9%85%D8%A7%D8%AA%D9%86%D8%A7_%D9%81%D9%8A_%D8%AA%D9%86%D9%81%D9%8A%D8%B0_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8%D8%9F\" >Why choose our Post Tension Slab fulfillment services?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n<h2 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D9%86%D8%B8%D8%A7%D9%85_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8_%D8%AA%D9%82%D9%86%D9%8A%D8%A9_%D9%85%D8%AA%D8%B7%D9%88%D8%B1%D8%A9_%D9%81%D9%8A_%D8%B9%D8%A7%D9%84%D9%85_%D8%A7%D9%84%D8%A8%D9%86%D8%A7%D8%A1\"><\/span>Post Tension Slab: A cutting-edge technology in the world of construction<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"direction: rtl; text-align: right;\">The Post Tension Slab System represents a paradigm shift in the world of modern construction. It combines modernity and efficiency, as it relies on cable tension after the concrete is poured to maximize durability and flexibility.<\/p>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D9%85%D8%A7_%D9%87%D9%88_%D9%86%D8%B8%D8%A7%D9%85_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8%D8%9F\"><\/span>What is the Post Tension Slab system?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"direction: rtl; text-align: right;\">Posttensioning Slab System is an advanced construction technique used to optimize the performance of structures. This system is characterized by increasing the bending and compressive strength of the structure, reducing the occurrence of bending and deformations in the structure.<\/p>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D8%A3%D9%87%D9%85%D9%8A%D8%A9_%D8%A7%D8%B3%D8%AA%D8%AE%D8%AF%D8%A7%D9%85_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D9%81%D9%8A_%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9_%D8%A7%D9%84%D8%A5%D9%86%D8%B4%D8%A7%D8%A6%D9%8A%D8%A9\"><\/span>The importance of using PostTension in construction projects<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"direction: rtl; text-align: right;\">The importance of <strong>Use <a href=\"https:\/\/hemamco.sa\/en\/%d9%85%d8%a7-%d9%87%d9%88-%d9%86%d8%b8%d8%a7%d9%85-%d8%a7%d9%84%d8%ae%d8%b1%d8%b3%d8%a7%d9%86%d8%a9-%d9%84%d8%a7%d8%ad%d9%82%d8%a9-%d8%a7%d9%84%d8%b4%d8%af\/\" target=\"_blank\" rel=\"noopener\">Post Tension<\/a><\/strong> In its ability to achieve wide seas without the need for many columns. It also contributes to reducing construction costs by reducing the amount of concrete and steel used.<\/p>\n<ul style=\"text-align: right;\">\n<li style=\"direction: rtl;\">Helps achieve greater flexibility in architectural design.<\/li>\n<li style=\"direction: rtl;\">It enhances the durability of buildings and increases their lifespan.<\/li>\n<li style=\"direction: rtl;\">We provide complete solutions to implement the PostTension system in various <a href=\"https:\/\/hemamco.sa\/en\/completed-projects\/\" target=\"_blank\" rel=\"noopener\">Projects<\/a>.<\/li>\n<\/ul>\n<p style=\"direction: rtl;\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-2101\" src=\"https:\/\/hemamco.sa\/wp-content\/uploads\/2025\/03\/\u0628\u0648\u0633\u062a-\u062a\u0646\u0634\u0646-\u0633\u0644\u0627\u0628-\u0645\u0634\u0631\u0648\u0639-\u0627\u0644\u0635\u0641\u0627.webp\" alt=\"\u0628\u0648\u0633\u062a \u062a\u0646\u0634\u0646 \u0633\u0644\u0627\u0628 \u0645\u0634\u0631\u0648\u0639 \u0627\u0644\u0635\u0641\u0627\" width=\"1280\" height=\"705\" title=\"\"><\/p>\n<h2 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D9%85%D9%83%D9%88%D9%86%D8%A7%D8%AA_%D9%86%D8%B8%D8%A7%D9%85_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8\"><\/span>Post Tension Slab Components<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"direction: rtl; text-align: right;\">The Post Tension Slab System consists of several key components that play an important role in ensuring the safety and durability of structures. These components work together to enhance the performance of structures and minimize potential risks.<\/p>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D8%A7%D9%84%D9%83%D8%A7%D8%A8%D9%84%D8%A7%D8%AA_%D9%88%D8%A7%D9%84%D8%A3%D8%B3%D9%84%D8%A7%D9%83_%D8%A7%D9%84%D9%85%D8%B3%D8%AA%D8%AE%D8%AF%D9%85%D8%A9_Strands\"><\/span>Used cables and wires (Strands)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"direction: rtl; text-align: right;\">The cables and wires used in the Posttension system are made of high-quality materials. These cables are characterized by their durability and ability to withstand high pressures.<\/p>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D9%86%D9%87%D8%A7%D9%8A%D8%A7%D8%AA_%D8%A7%D9%84%D9%83%D8%A7%D8%A8%D9%84%D8%A7%D8%AA_Dead_end_Live_end\"><\/span>Dead end &amp; Live end<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"direction: rtl; text-align: right;\">Cable ends play a critical role in stabilizing cables and ensuring structural integrity. We use high-quality Anchor Heads to ensure that the cables are securely fastened.<\/p>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D8%A7%D9%84%D8%A3%D9%86%D8%A7%D8%A8%D9%8A%D8%A8_%D8%A7%D9%84%D9%88%D8%A7%D9%82%D9%8A%D8%A9_Ducts\"><\/span>Ducts<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"direction: rtl; text-align: right;\">Protective tubing is used to protect cables from environmental factors and damage. These tubes are made of durable and corrosion-resistant materials.<\/p>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D8%A7%D9%84%D9%83%D8%B1%D8%A7%D8%B3%D9%8A_%D9%88%D8%A7%D9%84%D8%AF%D8%B9%D8%A7%D9%85%D8%A7%D8%AA\"><\/span>Chairs and supports<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"direction: rtl; text-align: right;\">Chairs and supports play an important role in supporting the cables and ensuring the load is evenly distributed.<\/p>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D9%85%D9%83%D9%88%D9%86%D8%A7%D8%AA_%D8%A5%D8%B6%D8%A7%D9%81%D9%8A%D8%A9_%D8%B6%D8%B1%D9%88%D8%B1%D9%8A%D8%A9_%D9%84%D9%84%D8%AA%D9%86%D9%81%D9%8A%D8%B0\"><\/span>Additional components necessary for implementation<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"direction: rtl; text-align: right;\">We provide all the ancillary components necessary to efficiently implement the Posttension system. These components include zippers, wedges, and Injection Tubes.<\/p>\n<p style=\"direction: rtl;\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-2099\" src=\"https:\/\/hemamco.sa\/wp-content\/uploads\/2025\/03\/\u0646\u0638\u0627\u0645-\u0627\u0644\u0628\u0648\u0633\u062a-\u062a\u0646\u0646\u0634\u0646-\u0641\u064a-\u0645\u062c\u0645\u0639-\u0627\u0644\u0634\u0631\u0641\u064a\u0629.webp\" alt=\"\u0646\u0638\u0627\u0645 \u0627\u0644\u0628\u0648\u0633\u062a \u062a\u0646\u0646\u0634\u0646 \u0641\u064a \u0645\u062c\u0645\u0639 \u0627\u0644\u0634\u0631\u0641\u064a\u0629\" width=\"1280\" height=\"705\" title=\"\" srcset=\"https:\/\/hemamco.sa\/wp-content\/uploads\/2025\/03\/\u0646\u0638\u0627\u0645-\u0627\u0644\u0628\u0648\u0633\u062a-\u062a\u0646\u0646\u0634\u0646-\u0641\u064a-\u0645\u062c\u0645\u0639-\u0627\u0644\u0634\u0631\u0641\u064a\u0629.webp 1280w, https:\/\/hemamco.sa\/wp-content\/uploads\/2025\/03\/\u0646\u0638\u0627\u0645-\u0627\u0644\u0628\u0648\u0633\u062a-\u062a\u0646\u0646\u0634\u0646-\u0641\u064a-\u0645\u062c\u0645\u0639-\u0627\u0644\u0634\u0631\u0641\u064a\u0629-300x165.webp 300w, https:\/\/hemamco.sa\/wp-content\/uploads\/2025\/03\/\u0646\u0638\u0627\u0645-\u0627\u0644\u0628\u0648\u0633\u062a-\u062a\u0646\u0646\u0634\u0646-\u0641\u064a-\u0645\u062c\u0645\u0639-\u0627\u0644\u0634\u0631\u0641\u064a\u0629-1024x564.webp 1024w, https:\/\/hemamco.sa\/wp-content\/uploads\/2025\/03\/\u0646\u0638\u0627\u0645-\u0627\u0644\u0628\u0648\u0633\u062a-\u062a\u0646\u0646\u0634\u0646-\u0641\u064a-\u0645\u062c\u0645\u0639-\u0627\u0644\u0634\u0631\u0641\u064a\u0629-768x423.webp 768w, https:\/\/hemamco.sa\/wp-content\/uploads\/2025\/03\/\u0646\u0638\u0627\u0645-\u0627\u0644\u0628\u0648\u0633\u062a-\u062a\u0646\u0646\u0634\u0646-\u0641\u064a-\u0645\u062c\u0645\u0639-\u0627\u0644\u0634\u0631\u0641\u064a\u0629-1170x644.webp 1170w\" sizes=\"(max-width: 1280px) 100vw, 1280px\" \/><\/p>\n<h2 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D9%85%D8%B2%D8%A7%D9%8A%D8%A7_%D8%A7%D8%B3%D8%AA%D8%AE%D8%AF%D8%A7%D9%85_%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8_%D9%81%D9%8A_%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9%D9%83\"><\/span>Advantages of using Post Tension Slab in your projects<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"direction: rtl; text-align: right;\">Post Tension Slab is an advanced technology in the construction world that offers many advantages. Using this technology can significantly improve the efficiency and effectiveness of construction projects.<\/p>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D8%AA%D9%82%D9%84%D9%8A%D9%84_%D8%B3%D9%85%D8%A7%D9%83%D8%A9_%D8%A7%D9%84%D8%A8%D9%84%D8%A7%D8%B7%D8%A7%D8%AA_%D9%88%D9%83%D9%85%D9%8A%D8%A9_%D8%A7%D9%84%D8%AE%D8%B1%D8%B3%D8%A7%D9%86%D8%A9\"><\/span>Minimize slab thickness and amount of concrete<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"direction: rtl; text-align: right;\">The Tension Slab System allows for a reduction in slab thickness and the amount of concrete used, resulting in savings in overall project costs.<\/p>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D8%B2%D9%8A%D8%A7%D8%AF%D8%A9_%D8%A7%D9%84%D9%85%D8%B3%D8%A7%D8%AD%D8%A7%D8%AA_%D9%88%D8%AA%D9%82%D9%84%D9%8A%D9%84_%D8%B9%D8%AF%D8%AF_%D8%A7%D9%84%D8%A3%D8%B9%D9%85%D8%AF%D8%A9\"><\/span>Maximize space and minimize the number of columns<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"direction: rtl; text-align: right;\">The use of post-tensioning can maximize free space within a building by reducing the number of columns, giving a more <strong>Organization<\/strong> and<strong>Expansion<\/strong> for wipers.<\/p>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D8%AA%D8%AD%D8%B3%D9%8A%D9%86_%D9%85%D9%82%D8%A7%D9%88%D9%85%D8%A9_%D8%A7%D9%84%D9%85%D9%86%D8%B4%D8%A2%D8%AA_%D9%84%D9%84%D8%B2%D9%84%D8%A7%D8%B2%D9%84_%D9%88%D8%A7%D9%84%D8%A7%D9%87%D8%AA%D8%B2%D8%A7%D8%B2%D8%A7%D8%AA\"><\/span>Improving the resistance of structures to earthquakes and vibrations<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"direction: rtl; text-align: right;\">The Post Tension Slab technology enhances the <a href=\"https:\/\/hemamco.sa\/en\/%d8%aa%d8%b5%d9%85%d9%8a%d9%85-%d8%a7%d9%84%d9%85%d8%a8%d8%a7%d9%86%d9%8a-%d8%a7%d9%84%d9%85%d9%82%d8%a7%d9%88%d9%85%d8%a9-%d9%84%d9%84%d8%b2%d9%84%d8%a7%d8%b2%d9%84-%d8%af%d9%88%d8%b1-%d8%a7%d9%84\/\" target=\"_blank\" rel=\"noopener\"><em>Resistance to installations<\/em> For earthquakes<\/a> and vibrations, providing greater safety for the building and its occupants.<\/p>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D8%AA%D9%88%D9%81%D9%8A%D8%B1_%D8%A7%D9%84%D9%88%D9%82%D8%AA_%D9%88%D8%A7%D9%84%D8%AA%D9%83%D9%84%D9%81%D8%A9_%D9%81%D9%8A_%D8%A7%D9%84%D8%AA%D9%86%D9%81%D9%8A%D8%B0\"><\/span>Save time and cost in implementation<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"direction: rtl; text-align: right;\">The Tension Slab System saves time and cost by minimizing the amount of materials used and speeding up the process. We also offer integrated solutions that ensure that the post-tensioning work is carried out efficiently.<\/p>\n<h2 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D9%85%D8%B1%D8%A7%D8%AD%D9%84_%D8%AA%D9%86%D9%81%D9%8A%D8%B0_%D8%A3%D8%B9%D9%85%D8%A7%D9%84_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8\"><\/span>Post Tension Slab Implementation Stages<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"direction: rtl; text-align: right;\">Implementing a Post Tension Slab requires careful planning and specific stages to ensure quality and safety. We follow an integrated approach that includes several key stages to ensure the success of the project.<\/p>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D9%85%D8%B1%D8%AD%D9%84%D8%A9_%D8%A7%D9%84%D8%AA%D8%B5%D9%85%D9%8A%D9%85_%D9%88%D8%A7%D8%B9%D8%AA%D9%85%D8%A7%D8%AF_%D8%A7%D9%84%D9%85%D9%88%D8%A7%D8%AF\"><\/span>Design and Material Approval Phase<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"direction: rtl; text-align: right;\">The implementation process starts with the design and material approval phase. At this stage, we design the Post Tension Slab system and select the right materials that comply with the project requirements and quality standards.<\/p>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D9%85%D8%B1%D8%AD%D9%84%D8%A9_%D8%A7%D9%84%D8%AA%D9%86%D9%81%D9%8A%D8%B0_%D9%88%D8%AA%D8%B1%D9%83%D9%8A%D8%A8_%D8%A7%D9%84%D9%83%D8%A7%D8%A8%D9%84%D8%A7%D8%AA\"><\/span>Implementation and cable installation phase<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"direction: rtl; text-align: right;\">During the implementation phase, we install the cables and protective tubes precisely according to the approved design. Chairs and supports are installed to ensure that the cables are properly secured.<\/p>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D9%85%D8%B1%D8%AD%D9%84%D8%A9_%D8%A7%D9%84%D8%B4%D8%AF_%D8%A8%D8%B9%D8%AF_%D8%B5%D8%A8_%D8%A7%D9%84%D8%AE%D8%B1%D8%B3%D8%A7%D9%86%D8%A9\"><\/span>Tensioning stage after pouring concrete<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"direction: rtl; text-align: right;\">After the concrete is poured and reaches the required strength, the cables are tensioned. Elongation readings are recorded and compared to theoretical values to ensure the results meet specifications.<\/p>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D9%85%D8%B1%D8%AD%D9%84%D8%A9_%D8%A7%D8%B9%D8%AA%D9%85%D8%A7%D8%AF_%D8%A7%D9%84%D9%86%D8%AA%D8%A7%D8%A6%D8%AC_%D9%88%D8%A7%D9%84%D8%AD%D9%82%D9%86\"><\/span>Authorization and Injection Phase<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"direction: rtl; text-align: right;\">The final stage involves the certification of the results of the stretching and injection processes. We calculate the discrepancy between actual and theoretical values, and certify the results if they are within permissible limits. Next, we inject the protective tubes with Grout to ensure that the cables are protected.<\/p>\n<h2 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D8%AA%D8%B7%D8%A8%D9%8A%D9%82%D8%A7%D8%AA_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8_%D9%81%D9%8A_%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9_%D8%A7%D9%84%D9%85%D8%AE%D8%AA%D9%84%D9%81%D8%A9\"><\/span>Post Tension Slab applications in different projects<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"direction: rtl;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2103\" src=\"https:\/\/hemamco.sa\/wp-content\/uploads\/2025\/03\/\u0627\u0633\u062a\u062e\u062f\u0627\u0645\u0627\u062a-\u0627\u0644\u0628\u0648\u0633\u062a-\u062a\u0646\u0634\u0646-\u0641\u064a-\u0627\u0644\u0645\u0628\u0627\u0646\u064a.webp\" alt=\"\u0627\u0633\u062a\u062e\u062f\u0627\u0645\u0627\u062a \u0627\u0644\u0628\u0648\u0633\u062a \u062a\u0646\u0634\u0646 \u0641\u064a \u0627\u0644\u0645\u0628\u0627\u0646\u064a\" width=\"1280\" height=\"704\" title=\"\"><\/p>\n<p style=\"text-align: right;\">\n<p style=\"direction: rtl; text-align: right;\">Post-tensioning slab technology is used in many critical infrastructure projects. We offer complete solutions for post-tensioned concrete work.<\/p>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D8%A7%D9%84%D9%85%D8%A8%D8%A7%D9%86%D9%8A_%D8%A7%D9%84%D8%B3%D9%83%D9%86%D9%8A%D8%A9_%D9%88%D8%A7%D9%84%D8%AA%D8%AC%D8%A7%D8%B1%D9%8A%D8%A9\"><\/span>Residential and commercial buildings<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"direction: rtl; text-align: right;\">The Post Tension Slab system finds wide applications in residential and commercial buildings, providing <strong>Reducing the thickness of the tiles<\/strong> and the amount of concrete, resulting in cost savings.<\/p>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D8%A7%D9%84%D9%85%D9%86%D8%B4%D8%A2%D8%AA_%D8%B0%D8%A7%D8%AA_%D8%A7%D9%84%D8%A8%D8%AD%D9%88%D8%B1_%D8%A7%D9%84%D9%88%D8%A7%D8%B3%D8%B9%D8%A9\"><\/span>Facilities with large seas<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"direction: rtl; text-align: right;\">In installations with large lakes, the Post Tension Slab plays a crucial role in <em>Structural Stabilization<\/em> without the need for internal columns, enhancing <a href=\"https:\/\/hemamco.sa\/en\/services\/\" target=\"_blank\" rel=\"noopener\">Architectural design<\/a>.<\/p>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9_%D8%A7%D9%84%D8%A8%D9%86%D9%8A%D8%A9_%D8%A7%D9%84%D8%AA%D8%AD%D8%AA%D9%8A%D8%A9\"><\/span>Infrastructure Projects<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"direction: rtl; text-align: right;\">Infrastructure projects such as bridges, tunnels, water and sewage plants benefit from PostTension Slab's <strong>Long-term sustainability<\/strong> and minimize maintenance costs.<\/p>\n<p style=\"direction: rtl; text-align: right;\">Thanks to this technology, we can achieve long-term sustainability and minimize material consumption, contributing to environmental protection and enhancing the efficiency of construction projects.<\/p>\n<h2 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D8%A7%D9%84%D8%AE%D9%84%D8%A7%D8%B5%D8%A9_%D9%84%D9%85%D8%A7%D8%B0%D8%A7_%D8%AA%D8%AE%D8%AA%D8%A7%D8%B1_%D8%AE%D8%AF%D9%85%D8%A7%D8%AA%D9%86%D8%A7_%D9%81%D9%8A_%D8%AA%D9%86%D9%81%D9%8A%D8%B0_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8\"><\/span>Conclusion: Why Choose Our Post Implementation Services<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p style=\"direction: rtl; text-align: right;\">With more than 15 years of experience, we are the perfect choice for PostTension Slab. <strong>Our full-service offerings<\/strong> in the field of post-tensioned concrete with high quality and competitive prices, ensuring the satisfaction of our customers.<\/p>\n<p style=\"direction: rtl; text-align: right;\">Our team includes highly experienced engineers and technicians in <em>Post-tensioning technique<\/em>. We use the latest technology and equipment to ensure the best results and the highest quality in the implementation of <strong>Tension system<\/strong>.<\/p>\n<p style=\"direction: rtl; text-align: right;\">We take pride in the trust of our customers and always strive to provide the best results by adhering to the agreed upon dates and specifications.<\/p>\n<section class=\"schema-section\">\n<h2 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D8%A7%D9%84%D8%A3%D8%B3%D8%A6%D9%84%D8%A9_%D8%A7%D9%84%D8%B4%D8%A7%D8%A6%D8%B9%D8%A9_%D8%AD%D9%88%D9%84_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8\"><\/span>Post Tension Slab FAQ<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<div style=\"text-align: right;\">\n<h3 style=\"direction: rtl;\"><span class=\"ez-toc-section\" id=\"%D9%85%D8%A7_%D9%87%D9%8A_%D8%AA%D9%82%D9%86%D9%8A%D8%A9_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8%D8%9F\"><\/span>What is Post Tension Slab technology?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<div>\n<div>\n<p style=\"direction: rtl;\">Post-slab technology is an advanced structural system used in the construction of slabs and roofs, where pre-tensioned cables are used to improve the strength of concrete and reduce its thickness.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div style=\"text-align: right;\">\n<h3 style=\"direction: rtl;\"><span class=\"ez-toc-section\" id=\"%D9%85%D8%A7_%D9%87%D9%8A_%D9%85%D8%B2%D8%A7%D9%8A%D8%A7_%D8%A7%D8%B3%D8%AA%D8%AE%D8%AF%D8%A7%D9%85_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8_%D9%81%D9%8A_%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9_%D8%A7%D9%84%D8%A8%D9%86%D8%A7%D8%A1%D8%9F\"><\/span>What are the advantages of using Post Tension Slab in construction projects?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<div>\n<div>\n<p style=\"direction: rtl;\">The advantages of using post-tensioning include reducing the thickness of slabs and the amount of concrete, increasing areas and reducing the number of columns, improving the resistance of structures to earthquakes and vibrations, and saving time and cost in implementation.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div style=\"text-align: right;\">\n<h3 style=\"direction: rtl;\"><span class=\"ez-toc-section\" id=\"%D9%83%D9%8A%D9%81_%D9%8A%D8%AA%D9%85_%D8%AA%D9%86%D9%81%D9%8A%D8%B0_%D8%A3%D8%B9%D9%85%D8%A7%D9%84_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8%D8%9F\"><\/span>How does the Post Tension Slab work?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<div>\n<div>\n<p style=\"direction: rtl;\">Post-tensioning is carried out through multiple phases, including design and material approval, execution and cable installation, post-tensioning after concrete pouring, results approval and injection<a href=\"https:\/\/ar.m.wikipedia.org\/wiki\/%D9%85%D9%84%D9%81:Post-Tensioning-Cables-10.jpg\" target=\"_blank\" rel=\"noopener\">.<\/a><\/p>\n<\/div>\n<\/div>\n<\/div>\n<div style=\"text-align: right;\">\n<h3 style=\"direction: rtl;\"><span class=\"ez-toc-section\" id=\"%D9%85%D8%A7_%D9%87%D9%8A_%D8%AA%D8%B7%D8%A8%D9%8A%D9%82%D8%A7%D8%AA_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8_%D9%81%D9%8A_%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9_%D8%A7%D9%84%D9%85%D8%AE%D8%AA%D9%84%D9%81%D8%A9%D8%9F\"><\/span>What are the applications of PostTension Slab in different projects?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<div>\n<div>\n<p style=\"direction: rtl;\">Post Tension applications include residential and commercial buildings, large-scale seaside facilities, and infrastructure projects.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div>\n<h3 style=\"direction: rtl; text-align: right;\"><span class=\"ez-toc-section\" id=\"%D9%84%D9%85%D8%A7%D8%B0%D8%A7_%D8%AA%D8%AE%D8%AA%D8%A7%D8%B1_%D8%AE%D8%AF%D9%85%D8%A7%D8%AA%D9%86%D8%A7_%D9%81%D9%8A_%D8%AA%D9%86%D9%81%D9%8A%D8%B0_%D8%A7%D9%84%D8%A8%D9%88%D8%B3%D8%AA_%D8%AA%D9%86%D8%B4%D9%86_%D8%B3%D9%84%D8%A7%D8%A8%D8%9F\"><\/span>Why choose our Post Tension Slab fulfillment services?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<div>\n<div>\n<p style=\"direction: rtl; text-align: right;\">We provide high-quality and experienced Tension Slab implementation services, while adhering to approved deadlines and budgets, to ensure satisfactory results for our clients.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>\u0647\u0644 \u062a\u062a\u0633\u0627\u0621\u0644 \u0643\u064a\u0641 \u064a\u0645\u0643\u0646 \u062a\u0639\u0632\u064a\u0632 \u0645\u062a\u0627\u0646\u0629 \u0627\u0644\u0645\u0628\u0627\u0646\u064a \u0648\u062a\u062d\u0633\u064a\u0646 \u0623\u062f\u0627\u0626\u0647\u0627 \u0627\u0644\u0625\u0646\u0634\u0627\u0626\u064a\u061f \u0646\u062d\u0646 \u0647\u0646\u0627 \u0641\u064a \u0647\u0645\u0645 \u0627\u0644\u0639\u0631\u0648\u0628\u0629 \u0644\u0644\u0645\u0642\u0627\u0648\u0644\u0627\u062a \u0646\u0633\u0639\u064a \u0644\u062a\u0642\u062f\u064a\u0645 \u062d\u0644\u0648\u0644 \u062a\u0642\u0646\u064a\u0629 \u0645\u062a\u0642\u062f\u0645\u0629 \u0645\u0646 \u062e\u0644\u0627\u0644 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u0634\u062f \u0627\u0644\u0644\u0627\u062d\u0642 \u0641\u064a \u0645\u0634\u0627\u0631\u064a\u0639 \u0627\u0644\u0628\u0646\u0627\u0621 \u0627\u0644\u0645\u062e\u062a\u0644\u0641\u0629. \u0646\u062d\u0646 \u0646\u0642\u062f\u0645 \u062d\u0644\u0648\u0644\u0627\u064b \u0645\u062a\u0643\u0627\u0645\u0644\u0629 \u0644\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643\u0645 \u0627\u0644\u0625\u0646\u0634\u0627\u0626\u064a\u0629 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0634\u062f \u0627\u0644\u0644\u0627\u062d\u0642\u060c \u0645\u0645\u0627 \u064a\u0633\u0627\u0647\u0645 \u0641\u064a \u062a\u0639\u0632\u064a\u0632 \u0642\u0648\u0629 \u0627\u0644\u0645\u0628\u0627\u0646\u064a \u0648\u0645\u062a\u0627\u0646\u062a\u0647\u0627. \u0628\u0641\u0636\u0644 \u0641\u0631\u064a\u0642\u0646\u0627 \u0645\u0646 \u0627\u0644\u0645\u0647\u0646\u062f\u0633\u064a\u0646 \u0648\u0627\u0644\u0641\u0646\u064a\u064a\u0646 \u0630\u0648\u064a \u0627\u0644\u062e\u0628\u0631\u0629\u060c \u0646\u0636\u0645\u0646 [&hellip;]<\/p>","protected":false},"author":1,"featured_media":10228,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[93],"tags":[94,95,96,97,98,99,100,101,102,103],"class_list":["post-2079","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-93","tag-94","tag-95","tag-96","tag-97","tag-98","tag-99","tag-100","tag-101","tag-102","tag-103"],"_links":{"self":[{"href":"https:\/\/hemamco.sa\/en\/wp-json\/wp\/v2\/posts\/2079","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hemamco.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hemamco.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hemamco.sa\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hemamco.sa\/en\/wp-json\/wp\/v2\/comments?post=2079"}],"version-history":[{"count":0,"href":"https:\/\/hemamco.sa\/en\/wp-json\/wp\/v2\/posts\/2079\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hemamco.sa\/en\/wp-json\/wp\/v2\/media\/10228"}],"wp:attachment":[{"href":"https:\/\/hemamco.sa\/en\/wp-json\/wp\/v2\/media?parent=2079"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hemamco.sa\/en\/wp-json\/wp\/v2\/categories?post=2079"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hemamco.sa\/en\/wp-json\/wp\/v2\/tags?post=2079"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}