Safa 85 Residential Compound

Safa 85 Residential Compound

The Safa 85 project was meticulously designed utilizing a Post-Tensioned Slab System, selected for its strategic advantages. This system allows for greater flexibility in parking layout, facilitates future modifications to internal partitions due to the minimized number of columns, and supports accelerated construction timelines. Additionally, it offers enhanced structural performance with higher design load capacities compared to traditional slab systems.

Scroll to Top